INSPECTOR shall monitor the project and manufacturing progress of these CNG package and PRU pressure vessels & Vent stack in accordance with ITP and project schedules.
The INSPECTOR shall report any anticipated delays to the work immediately to COMPANY.
The INSPECTOR shall expedite and monitor progress of fabrication and manufacturing by Oncall basis which will be instructed by COMPANY.
It is the responsibility of the INSPECTOR to ensure that inspection is carried out on or before the agreed date.
Inspection, Review, Witness and Collection the Certificates and Reports for pressure vessels, gas cooler, piping and structure
The INSPECTOR is required to inspect, witness, review and collect the Certificate and submit inspection report to COMPANY to ensure the quality is incompliance with Specifications and
Standards.
Material Certificate Inspection and Review
NDE Report Review
Hydrostatic Test Witness
Pickling & Passivation Inspection
Painting Inspection
Review of Calibration Certificate for all instrumentations used for testing
Visual inspection and dimensional check of the equipment, skid and package, especially package tie-in point orientation
Proof load test witness and certificates for lifting equipment
Witness Assembly and Test for CNG compressor package (compressor and complete package test)
After completion of all the manufacture, the INSPECTOR shall witness the assembly and tests
of the compressor package.
Requirements:Interested applicants may email a WORD CV to admin@regiondiv.com and inspection@regiondiv.com with indicative current basic and availability.